The cost of demolishing a house cannot be set solely by the floor area. Two similarly sized buildings may require very different work and resources.

The main factors that influence the price

Type of structure

  • Brick house
  • Concrete house
  • Timber structure
  • Steel structure
  • Mixed construction

Area and height

A multi-storey building may require a different working method than a single-storey outbuilding.

Machinery access

The price can increase if:

  • The street is narrow
  • The gate does not allow the machine in
  • The plot is sloped
  • There is no room for containers
  • Materials must be moved by hand

Foundations and concrete slabs

Demolishing the superstructure does not always include breaking the foundations, basement, paths or slabs.

Sorted demolition debris in separate piles on a clean site
Sorted debris helps control transport and disposal costs.

Debris removal

The quantity, weight and type of materials influence:

  • The number of trips
  • The type of truck
  • Disposal fees
  • The cost of sorting
  • The loading cost

Special materials

Some materials must be identified and handled through appropriate procedures and operators.

Excavator bucket lifting mixed rubble onto a dump truck
Loading and transport are a significant share of the total cost.

What should the quote include?

  • Site preparation
  • Labour
  • Machinery
  • Demolition of the structure
  • Foundation demolition
  • Loading
  • Transport
  • Disposal fees
  • Sorting of materials
  • Final levelling
  • Estimated duration
  • Works not included

Why an on-site assessment is necessary

The site visit allows checking the access, the structure, the neighbouring properties and the approximate quantity of materials.

Frequently asked questions

Is the price calculated per square metre?+
Sometimes an estimate based on area can be used, but the final price must take the real conditions of the project into account.
Is debris removal included?+
It depends on the quote. This must be made clear before the work begins.
Is foundation demolition included automatically?+
Not always. It must be specified whether the foundation, basement or slabs will be removed.

Need a project assessment?

Every demolition or excavation project has different access, terrain, structure and removal conditions. Send us your project details for a personalised assessment.

Request a personalised quote

Fill in the form and the Art Deco Concept team will contact you to assess your demolition, excavation or site preparation project.